Network Rail |
 |
Maesteg Frequency Enhancements Tondu junction
remodelling feasibility design |
 |
Llanwern new railway station feasibility
design |
 |
Pembroke Dock railway station enhancement
feasibility design |
 |
Ebbw Vale railway station extension
feasibility design |
 |
Cardiff area modular car park feasibility
designs |
 |
ERTMS new depot survey and design at Coleham |
 |
Southall East track quality improvement survey,
design and ALC tamping |
 |
Todmoreden plain line renewal surveying and
setting out |
 |
Tir-phil Station doubling survey and
feasibility design |
 |
OLE support for in-house design development
for S&C renewals |
|
|
|
Birse
Rail |
 |
Mercer survey and design for under-bridge
reconstruction |
 |
Leeds / Liverpool Canal survey and clearance
verification for under-bridge strengthening |
 |
Roscoes survey and design for under-bridge
repairs |
 |
Nether Alderley monitoring support for
sinking caissons for new under-bridge
foundations |
 |
Knutsford survey and design for new
under-bridge construction |
 |
Nether Alderley survey, design and OLE
verification for new under-bridge |
 |
Captain Piggots survey and design for
under-bridge reconstruction |
 |
Ladybridge survey and design for
under-bridge repairs |
 |
Arnside Viaduct inspection and design for
viaduct repairs and track fastening
replacement |
 |
Birkdale survey and design for under-bridge
repairs |
 |
Ducie Street survey and design for
under-bridge reconstruction |
|
|
Story Rail |
 |
S&C Jcn removal survey & design at
Ellesmere Port, including technical site support |
 |
Plain line renewal survey and design at
Cleveland Potash |
 |
Provision of technical site
support on track renewals and structure enhancements |
|
|
Owen Williams / Amey |
 |
Reading - Paddington line-speed enhancements
survey and designs |
 |
1300 route miles of drainage examinations
throughout the GW territory |
 |
300 route miles of GPS drainage examinations
throughout the SE / LNE territories |
 |
Annual national leased depot inspections |
 |
Llanwern East double junction S&C design |
 |
Swindon East new passing
loop design |
 |
Bromsgrove - Stoke Works Jcns S&C and
drainage design, with a new passing loop
|
 |
Slough West junction S&C design |
 |
St Annes junction
(Bristol) S&C design |
 |
London Road junction (Derby) S&C design
|
 |
Kettering junction S&C design |
 |
Laira junction (Plymouth) S&C design |
 |
Bristol Parkway new platform design |
|
|
Amalgamated Construction |
 |
Track monitoring and technical site support
on numerous structure enhancements |
|
|
Nexus : Tyne & Wear Metro |
 |
Byker viaduct track fastening system design and
project management support |
 |
Gosforth depot direct fastening renewal design |
 |
Jesmond - Manors Link (Byron St) track
reinstatement design |
 |
North Shields Tunnel track renewal survey and
design |
 |
Backworth lateral resistance endplates
installation |
|
|
White Young Green |
 |
EGIP (Edinburgh - Glasgow Improvements
Program, P Way responsible engineer |
 |
Wessex (Package A) platform extensions x 11,
P Way and 3rd Rail design |
 |
Wessex (Package E) platform extensions x 8,
P Way and 3rd Rail design |
 |
Kirknewton station design for level crossing
elimination and new under-bridge |
 |
Owen street station design for level crossing
elimination and new under-bridge |
|
|
Manchester Metro |
 |
Phase 3 track condition assessments on the
Altrincham - Bury routes |
 |
Provision of OLE engineering project
services |
 |
Pantograph clearance assessments for new
rolling stock |
 |
As-built survey of city centre renewals |
 |
City Centre OLE insulator installation
design |
 |
Secondary feeder support renewals design |
|
|
Serco Rail |
 |
Newton Heath slab track design for new train
paint shed |
 |
Hoylake station clearance enhancements |
 |
Styal branch platform clearance
enhancements |
|
|
|
MerseyRail |
 |
Asset
condition examination and reporting on depots
|
|
|
|
Carillion
Rail |
 |
Hemsworth A1
Link Road track design for new under-bridge
|
 |
Langley
Station line speed enhancement survey and design
|
 |
Technical
control of site engineering on the
Reading - Paddington LSE project |
 |
17 x No.
plain line track renewals survey and design in
the NW |
 |
Carnforth
WCRM remodelling drainage design |
 |
Site support on all technical aspects of the
stressing restoration at approx. 90 sites |
|
|
London Underground Ltd |
 |
Design
of Baker Street junction within the sub-surface
section |
 |
Design of Gloucester Road diamond junction
within the sub-surface section |
|
|
Scott Wilson Railways |
 |
Survey and design of several S&C renewals
within GW Region
at various stages |
 |
Survey, design and
clearance improvement schemes on ECML
diversionary routes |
 |
Survey and re-design of 5 major junctions in
Scotland for quality improvements |
 |
Preparing feasibility design options as
part of Crossrail studies |
 |
8 x station clearance assessments in
Scotland |
 |
21 x double junctions clearance assessments
in Scotland |
 |
6 x route
clearance assessments and design improvements in
Scotland |
 |
Scotland
national gauging & datum plating of 80
routes not covered by the SGT |
|
|
|
Ministry of Defence |
 |
Bi-annual
track condition inspections at Lulworth firing
range |
|
|
|
L&NWR
Crewe |
 |
Survey &
assessment for the installation of a new CET
/ Fuelling siding |
|
|
Mowlem Railways |
 |
Survey, design and site support of 17 x No. plain line track renewals on R7
alliance |
 |
Design of 14km of 3rd rail redistribution at
Alton to Farnham |
 |
Manchester
Metro Phase III bid support, including
inspection and scope definition |
 |
Independent
review of Belfast and Bangor design documentation |
 |
Bi-annual track condition inspection of MOD
private rail systems |
|
|
Clough Smith Rail |
 |
Gresty Green
track and OLE feasibility design for new LMD |
 |
Ardwick LMD
(Siemens) track feasibility design for
additional capacity |
 |
3.5km of
track renewal technical site support on
Blackpool trams |
|
|
|
McML Systems |
 |
Provision of OLE training in India |
|
|
Colas |
 |
Points heating design |